August 29, 2020|
  • Nederlands

Randweg Eindhoven closed for bicycle bridge placement, spectacle attracts a lot of attention

The specialized transport company Mammoet started on Saturday evening 29 August 2020 with the spectacular installation of a 160 meter long new bicycle bridge over the Randweg Eindhoven. The spectacle attracts a lot of attention. The A2/N2 motorway is closed and will remain closed until 8:00 am on Sunday morning

The bicycle bridge is necessary because the Anthony Fokkerweg is being widened for car traffic. The current cycle path on Anthony Fokkerweg will disappear. The entire operation can be followed live from 10 pm via a livestream from the municipality of Eindhoven.

Read more at Ed.nl (in Dutch). Zie ook: Watch live with placement of bicycle bridge ‘Tegenbosch’ over A2.

Share this story, choose your platform!